摸进她的内裤里疯狂揉她动图视频,亚洲人成网亚洲欧洲无码久久,久久婷婷五月综合97色一本一本,久久久精品人妻一区亚美研究所

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Company News

How to install the insulation connector?

  • Author:Libo
  • Source:wkmeufh.cn
  • Date:2021-06-11
  • Click:0

1. Pressure test of insulation joint and pipeline instrument.

2. The central wheelbase of the joint should be installed on a straight line with the central wheelbase of the pipeline, and the two centers

The wheelbase shall not be greater than 0.2mm when installed.

3. When the insulation joint is installed on the ground, it should be installed on the straight pipe section 20 meters away from the elbow and a support should be provided.

4. The insulation joint can be installed on the underground straight pipe section.

5. After the insulation flange is connected with the pipeline, do not lift the pipeline within 5 meters of the connector.

 

6. After the insulation joint is connected with the pipeline, the surface temperature of the insulation joint should not be higher than 120℃ during the repair and anti-corrosion work as required.

 

7. Avoid burying the installation in a place where there is perennial water. Installation requirements: 1. The insulation joint shall be installed within 50 meters to avoid a dead welding hole.

 

Online
聯(lián)系方式

熱線電話

18739187123

上班時間

周一到周五

公司電話

0391-7588881